Purchasing Guideline
General Purchasing Guideline
- All hardware/software requests charged to the departmental accounts should be approved by the Facilities Committee (FC).
- Requests of more than HK$20,000, will have to be announced to all faculty members for comment.
- Faculty members are strongly recommended to discuss with CS System about the support level should they want to buy any non-standard equipment, as not all types of equipment are fully supported by CS System.
Standard PC configuration
- The current standardard configuration for PC provision.
Faculty
- For faculty specific purchasing guidelines, please refer to: Budget Allocation in the "Restricted Area".
PGs, RAs, Demonstrator/IAs and PostDoc
- Every PG student is entitled to a machine (but not necessarily new). Upgrades of PG machines will be discussed on a case-by-base basis.
- IA, Postdoc, RA, PG (except the first year) will have his/her own machine, depending on what spare machine available at that time. The supervisors will have to request a new machine if such need arises.
- New PG (PhD or Mhil) will be provided a PC (not necessarily new).
- New PG without supervisor may have to share machine.
- There will be no automatic individual screen display upgrade for PG students, the display upgrade should couple with the machine upgrade. (decision made in Jan 30, 2004 FC meeting)
- Each PG office will have one laser printer.
- The supervisor should send request for PG machine upgrade to FC for approval. Justification is needed for upgrading machine less than four years old.
- Machines provided to IA/Demonstrator may be reviewed for upgrade when they are four years old.
PGs in special Labs
- PGs assigned to a special Lab outside CS (HLTC, CyberSpace, MTREC, etc) should be provided with the same equipment. However the equipment will have to move back to the Department when they graduate.
- For faculty advising PGs from other departments, there will be no equipment provision.
Teaching Labs
- The hardware of four teaching labs will be upgraded once every four year in this order Lab1 → Lab2 → Lab4 → Lab3.
- Lab2 was upgraded in the summer of 2009.
- The projector in the teaching lab will be considered for possible upgrade together with the teaching lab hardware upgrade.
- At least one laser printer is installed in each teaching lab.
FYP Lab
- The FYP Lab contains ~20 machines with removable disk trays. FYP groups can loan out disk for their projects.
- Each faculty can request up to $3,000 for FYP equipment per year by default (no need to go through FC for approval). Request beyond the $3,000 limit will need approval from the FC. This policy has been reviewed and sustained. You may fill in the form to proceed to purchase/reimburse.
- Each request for FYP funding should specify the specific FYP project for which the equipment is being requested.
- FYP allocation will be approved based on guidelines and the specific project noted down upon approval.
- FYP allocation should not be used to purchase general equipment, e.g. PC.
- Charging year will be determined by the FYP project specified.
- No charge back or carry forward in general
- Cannot be combined with other equipment funding
- Equipment belonged to FYP, will be claimed back and reset default settings at the end of the FYP year
- For any purchase request above $3,000, the special request should be sent to FC for discussion.
- Clarification about FYP allocation/equipment by FC (Faculty access only)
Software
- The Department supports mainly the following software requests:
- Softwares for teaching or infrastructure.
- Maintenance of softwares purchased by Department before.
- The department has been providing many commonly used softwares as standard for faculty to use, e.g. Acrobat, Microsoft Offices, X-Win32, etc.
- Many additional softwares are available through the Windows Terminal Server, w2kts.cse.ust.hk, such as WinEdt, Photoshop, Dreamweaver.
- Sometimes, faculty request for special software. As a fule, faculty are encouraged to buy such software thorugh their research funds.
- The FC will review the list of commonly used software from time to time.
Updated: Jun 20 2011
Any request not cover in the guideline can be sent to FC (email: ) for discussion/approval.